Please use this identifier to cite or link to this item: https://hdl.handle.net/10419/155501 
Year of Publication: 
2015
Citation: 
[Journal:] Journal of Remanufacturing [ISSN:] 2210-4690 [Volume:] 5 [Issue:] 8 [Publisher:] Springer [Place:] Heidelberg [Year:] 2015 [Pages:] 1-12
Publisher: 
Springer, Heidelberg
Abstract: 
Remanufacture, a process of returning used products to 'as-new' condition with matching guarantee, is commercially viable where the remaining value in the used product and the final selling price are much higher than the cost of the products' rebuilding. Guide identified that remanufacturers perceive the scarcity of effective remanufacturing tools and techniques as a key threat to the industry whilst Ijomah assessed the key remanufacturing issues on a five-point scale ranging from 'Not Significant through to 'Critical'. Component inspection was the only issue rated as 'critical' by all remanufacturers. Extensive work within the industry plus the detailed analysis and observation of the remanufacturing process during this research has shown that component inspection has significant bearing on overall productivity. However, the activity is undertaken in a hap-hazard manner based almost purely on experience and guesswork and lacks proper methodologies and tools. This paper presents the results of quantitative research, conducted in a Caterpillar UK Remanufacturing facility, to establish the relationship between pre-processing inspection and the subsequent remanufacturing process time for returned cores (used products).
Subjects: 
Remanufacturing
Pre-processing
Inspection methodology
Persistent Identifier of the first edition: 
Creative Commons License: 
cc-by Logo
Document Type: 
Article

Files in This Item:
File
Size
693.23 kB





Items in EconStor are protected by copyright, with all rights reserved, unless otherwise indicated.