Browsing All of EconStor by Author Kellenbrink, Carolin
Showing results 1 to 7 of 7
Year of Publication | Title | Author(s) |
2013 | Scheduling resource-constrained projects with a flexible project structure | Kellenbrink, Carolin; Helber, Stefan |
2014 | Quality- and profit-oriented scheduling of flexible resource-constrained projects | Kellenbrink, Carolin; Helber, Stefan |
2017 | Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints | Schnabel, André; Kellenbrink, Carolin; Helber, Stefan |
2018 | Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints | Schnabel, André; Kellenbrink, Carolin; Helber, Stefan |
2020 | Simultaneous structuring and scheduling of multiple projects with flexible project structures | Hoffmann, Luise-Sophie; Kellenbrink, Carolin; Helber, Stefan |
2023 | The parcel hub scheduling problem with limited conveyor capacity and controllable unloading speeds | Bugow, Stefan; Kellenbrink, Carolin |
2023 | Evaluation of stochastic flow lines with provisioning of auxiliary material | Helber, Stefan; Kellenbrink, Carolin; Südbeck, Insa |