Bitte verwenden Sie diesen Link, um diese Publikation zu zitieren, oder auf sie als Internetquelle zu verweisen: https://hdl.handle.net/10419/243735 
Erscheinungsjahr: 
2020
Quellenangabe: 
[Journal:] Energy Reports [ISSN:] 2352-4847 [Volume:] 6 [Issue:] 1 [Publisher:] Elsevier [Place:] Amsterdam [Year:] 2020 [Pages:] 214-220
Verlag: 
Elsevier, Amsterdam
Zusammenfassung: 
A government plan was announced to expand the share of renewable energy to 20 percent by 2030 in Korea and to construct additional pumped hydro storage (PHS) to prepare for the uncertainty of renewable generation. However, due to the distortion of the Korean electricity market, pumped storage power plants are operating in the red, which may cause controversy over the economic feasibility of additional construction. In this study, we intend to analyze the exact economic value of the PHS in Korea under the plan for supplying electricity in 2030. To this end, an annual economic dispatch algorithm was developed using linear programming model and various scenarios were analyzed, including securing reserve power to cope with the variability of renewable energy. As a result of the analysis, we can confirm the economic feasibility of PHS prepare for expansion of renewable energy if PHS are correctly compensated according to the value contributing to the stable operation of the grid in the electricity market.
Schlagwörter: 
Economic analysis
Linear programming
Pumped hydro storage
Renewable energy
Persistent Identifier der Erstveröffentlichung: 
Creative-Commons-Lizenz: 
cc-by-nc-nd Logo
Dokumentart: 
Article
Erscheint in der Sammlung:

Datei(en):
Datei
Größe
756.11 kB





Publikationen in EconStor sind urheberrechtlich geschützt.